Vancouver aquatic centre rebuild to not include lap pool

by tanya_martins_2 | March 25, 2025 2:48 pm

Front view of a young African-American woman wearing a blue swimming cap and goggles swimming in the swimming pool[1]
The Vancouver Aquatic Centre rebuild will not include a 50-m (64-ft) pool. Photo courtesy Wavebreak Media/bigstockphoto.com

Per a report by the Vancouver Sun,[2] the Vancouver Aquatic Centre rebuild will not include a 50-m (64-ft) pool and the centre’s existing pool will have to be replaced with one half the size.

Initially, the rebuild, which was set to cost $140 million, now costs around $170 million.

Work on the new facility, which will include a much larger hot tub and a lazy river, is expected to start late next year.

Endnotes:
  1. [Image]: https://www.poolspamarketing.com/wp-content/uploads/2025/03/TM_VancouverAquaticCentre-1.jpg
  2. Per a report by the Vancouver Sun,: https://vancouversun.com/news/local-news/vancouver-aquatic-centre-rebuild-will-not-have-a-50-metre-lap-pool

Source URL: https://www.poolspamarketing.com/trade/news/vancouver-aquatic-centre-rebuild-to-not-include-lap-pool/